Cookies and browser storage
We use an essential session cookie for sign-in/security and, where needed, a limited shared-file access cookie. Browser storage remembers language, theme, workspace/navigation, consent and local preferences; sign-in abuse controls can use a local attempt counter. A remembered session can last up to 30 days; a non-remembered cookie ends with the browser session, subject to server expiry. Browser preferences can remain until changed or cleared. Shared-file access is limited to its short expiry. These functions are distinct from advertising tracking.
Optional analytics only with your consent
Analytics stays off until you allow it in the banner or on this page. If you allow it, Google Analytics 4 sets first-party cookies on workvado.com (_ga and _ga_WKP8GHWX3B, for up to 13 months) and receives screen names, the referring site, device and browser type, and an approximate location that Google derives from the connection; it never receives your records, names, identifiers or search terms. Google signals, advertising features and data sharing are off. Withdrawing here stops measurement and deletes those cookies. No advertising tracker or marketing provider is active; the marketing choice is only recorded. Declining does not block the core service; GPC forces analytics and marketing off and must not be overridden. Legacy Do Not Track does not alter essential cookies. We do not authorize third-party cross-site advertising tracking through Workvado.
Review or clear your choices
Use these controls and your browser's cookie/storage settings. Clearing storage can sign you out and reset language or other preferences; blocking necessary storage can impair the requested functions. Do not treat this browser-specific choice as deletion of server records or every device's settings. External links, images, maps and user-connected integrations can follow their own notices. For personal-data requests use /privacy/requests or contact@workvado.com and see the Privacy Notice.
Litequo LLC
ZZZZT Building, 1st Floor22 Capitol Avenue, Ste 169
Cheyenne, WY
United States
contact@workvado.com