Published construction notices from the United States, Canada and Mexico. Status follows the saved notice and deadline; confirm current eligibility, mandatory visits, amendments and submission instructions with the buyer. Create a free contractor account for full details and a private bid pipeline.
Department of Transport (TC) · Îles-de-la-Madeleine, QC, Canada
Response deadline
Administer, operate and maintain Transport Canada's Îles-de-la-Madeleine Airport, including runways, roads, buildings, equipment and building systems. The initial period is April 1, 2027 to March 31, 2028, with two optional annual extensions; the notice requires the October 15 mandatory site visit.
Status in saved notice: closing_soon
Mandatory site visit was October 15, 2026 at 10:00 ADT at the airport, 210 Chemin de l’Aéroport. Non-attendance makes the bid non-responsive; the notice offers no alternative session. Attendance registration was due October 12 at 16:00 ADT. Review the full solicitation before bidding.
Department of Public Works and Government Services (PSPC) · Lethbridge, AB, Canada
Response deadline
Provide professional and construction services for energy-efficiency improvements at AAFC's Lethbridge Research and Development Centre under the Federal Buildings Initiative. The scope includes financing, training, and measurement and verification of the improvements.
Correctional Service of Canada (CSC) · Mission, BC, Canada
Response deadline
Replace the perimeter-intrusion and facility-alarm integration units at Mission Institution, including design, equipment, software, installation, testing and training. This RFP is restricted to Bosch Building Technologies Inc. and Vipond Inc. under the stated security-system supply arrangements.
Status in saved notice: closing_soon
Restricted RFP under security-system Supply Arrangements CW2440311 and CW2440314. Only the invited holders Bosch Building Technologies Inc. and Vipond Inc. may submit proposals; this is not a new qualification opportunity. The notice states that this contract has no security requirements and no Indigenous set-aside.
Construct the remote Beaver Brook Camp at the junction of Lake Melville and the Etagaulet River, including a lodge, privy, storage building, boardwalks, tent pads, solar power and seasonal floating dock. This stage-two tender is restricted to suppliers qualified in the first stage.
Status in saved notice: closing_soon
This is the second stage of the procurement. Only suppliers qualified or invited through the earlier stage may submit the prime-contract bid; it is not a new open qualification round. Review the complete current solicitation and amendments for the remaining mandatory requirements.
Department of Public Works and Government Services (PSPC) · Metchosin, BC, Canada
Response deadline
Qualify for replacement of the PS4 switch with PME-13 dead-front equipment at William Head Institution in Metchosin. This is the phase-one qualification stage for the electrical construction work.
Status in saved notice: closing_soon
Qualification or source-list registration only. Admission does not award a contract or guarantee work; subsequent calls may contain their own eligibility, security and site-access requirements. Follow the official application method and current solicitation terms.
Supply five line-maintenance trucks for delivery to CFB North Bay, Kingston, Suffield, Gagetown and Wainwright. The requested delivery is 300 days after award, with an option for five additional trucks for delivery within Canada.
Replace the marine fuel system and docks at Parks Canada's Sidney Operations Centre for Gulf Islands National Park Reserve. This stage-two procurement includes marine structures, pilings and new dock works and is for previously qualified suppliers.
Status in saved notice: closing_soon
This is the second stage of the procurement. Only suppliers qualified or invited through the earlier stage may submit the prime-contract bid; it is not a new open qualification round. Review the complete current solicitation and amendments for the remaining mandatory requirements.
Correctional Service of Canada (CSC) · Gravenhurst, ON, Canada
Response deadline
Replace one pad-mounted and one pole-mounted transformer at Beaver Creek Institution (Minimum), including PCB equipment and oil disposal, outage coordination, testing and site restoration. The published procurement document requires completion by December 31, 2026.
Status in saved notice: open
The official procurement document specifies Canadian suppliers and suppliers of an applicable trading partner, a lowest-priced compliant-bid strategy, no Indigenous set-aside and no contract security requirement. Work must be complete by December 31, 2026. This competitive description is used instead of interpreting the feed’s Directed Contract type as a sole-source award.
Department of Public Works and Government Services (PSPC) · Lethbridge, AB, Canada
Response deadline
Qualify for electrical upgrades to building B102 at AAFC's Lethbridge Research and Development Centre. This is the first-stage ITQ for the subsequent construction procurement.
Status in saved notice: open
Qualification or source-list registration only. Admission does not award a contract or guarantee work; subsequent calls may contain their own eligibility, security and site-access requirements. Follow the official application method and current solicitation terms.
Ministry of SaskBuilds and Procurement · Wollaston Lake, SK, Canada
Response deadline
Reconstruct subgrade and surfacing on the runway, taxiway and apron, and rehabilitate airfield electrical systems at Wollaston Lake Airport. The work also includes chain-link fencing.
Status in saved notice: open
A bid deposit of 5% of the total bid is required. Inquiries about the bid package must be sent at least three business days before closing. Confirm the accepted security form and all eligibility conditions in the buyer’s current tender package.
Rehabilitate the Millennium Library parkade structure while keeping the facility open, with work phased across its P1 and P2 levels. The scope includes concrete slab demolition and replacement, repairs, waterproofing, drainage, and associated architectural, mechanical and electrical work.
Provide electrical personnel, supervision, tools and equipment on an as-requested basis for ISED. Services include installation, inspection, troubleshooting, maintenance and replacement of electrical distribution, fire-alarm and communication systems.
Department of National Defence (DND) · Oromocto, NB, Canada
Response deadline
Supply uninterruptible power supplies for DND in Oromocto, New Brunswick. The solicitation identifies the technical requirements and a preference for Canadian goods or services.
Status in saved notice: open
The notice states a preference for Canadian goods/services; it is not presented here as an unconditional Canadian-supplier-only set-aside.
Supply a high-voltage protective flooring system for the Department of National Defence. The solicitation states a preference for Canadian goods or services and defines the equipment requirements in the formal bid package.
Status in saved notice: open
The notice states a preference for Canadian goods/services; it is not presented here as an unconditional Canadian-supplier-only set-aside.
Department of Public Works and Government Services (PSPC) · BC, Canada
Response deadline
Replace a fuel tank and dispenser while retaining the existing Computrol controller. This phase-two procurement is limited to suppliers qualified through the earlier solicitation stage.
Status in saved notice: open
This is the second stage of the procurement. Only suppliers qualified or invited through the earlier stage may submit the prime-contract bid; it is not a new open qualification round. Review the complete current solicitation and amendments for the remaining mandatory requirements.
Department of Public Works and Government Services (PSPC) · Springhill, NS, Canada
Response deadline
Qualify for replacement of HVAC units at Springhill Institution, including related architectural, electrical and control work in five buildings. The notice describes a construction period of 150 weeks after award and an estimated range of CAD 5,000,001 to CAD 20 million including HST.
Status in saved notice: open
Qualification or source-list registration only. Admission does not award a contract or guarantee work; subsequent calls may contain their own eligibility, security and site-access requirements. Follow the official application method and current solicitation terms.
Supply and deliver three new centrifugal blowers to the Lansdowne Wastewater Treatment Centre. The units must meet specified performance, electrical and operational requirements and integrate with the existing headworks aeration system.
Defence Construction Canada · Greenwood, NS, Canada
Response deadline
Install a 300 kW photovoltaic array with battery energy storage, diesel generators, electrical infrastructure and a grid controller at 14 Wing Greenwood. The work includes integration, commissioning and associated site and electrical work.
Supply and install two above-ground pressure reducing valve kiosk stations, including piping, instrumentation, watermain installation, electrical work, site servicing and related civil work. The 86 Avenue station is an optional scope.
Fraser Health Authority seeks a vendor for an electrical capacity assessment at Squamish General Hospital. The procurement documents and proposal submission are hosted on Fraser Health’s Bonfire portal.